[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 10, Issue 33 (7-2023) ::
2023, 10(33): 47-56 Back to browse issues page
Economic and financial assessment of the consequences of runoff forecast in dam and hydropower projects (Case study: Karun 4 and Rudbar Lorestan dams and power plants
Reza Ayoubikia , Hamidreza Eslami , Saeid Jamali , Kamyab Eslami
, pta_data@yahoo.com
Abstract:   (660 Views)
Increasing energy demand has made improving the management of resource utilization and energy inevitable. The purpose of this article is to compare the power generation of two power plants of Karun 4 and Rudbar dams in the period of 1397-98 in two cases with flood forecasting and warning without applying and paying attention to flood warning and finally estimating economic benefits and revenues. It is a prediction of the use of this system. Flood forecasting and warning systems are among the non-structural methods of flood management that in combination with structural methods can increase the efficiency of flood management. This system timely warnings through planning and management of dam reservoir operation, enables the creation of broad benefits in reducing flood damage lands. In addition to these benefits, another part of the positive effects of these systems is the increase in electricity production in hydropower plants. The results of this study show that the amount of electricity generation in the power plants of dams in the state of flood warning activity by increasing the release from the turbines of power plants before the flood and preventing overflow, 3.9 and 4.8% more than Flood alert mode is desired during the annual interval.
Keywords: Flood warning, discharge forecast, hydroelectric power plant, Karun 4, Lorestan Rudbar
Full-Text [PDF 886 kb]   (96 Downloads)    
Type of Study: Research | Subject: توسعه پایدار، زیست محیطی و ارزیابی اقتصادی
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Ayoubikia R, Eslami H, Jamali S, Eslami K. Economic and financial assessment of the consequences of runoff forecast in dam and hydropower projects (Case study: Karun 4 and Rudbar Lorestan dams and power plants. Iranian Dam and Hydroelectric Powerplant 2023; 10 (33) :47-56
URL: http://journal.hydropower.org.ir/article-1-495-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 10, Issue 33 (7-2023) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.05 seconds with 38 queries by YEKTAWEB 4645