[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 5, Issue 17 (9-2018) ::
2018, 5(17): 13-24 Back to browse issues page
Stability analysis of cut-off wall during construction and the remediation methods – Case study: Nohob Dam cut-off wall
Abstract:   (2158 Views)

In order to prevent leakage in the basement of dams, there are cutoff  walls or membranes below the dam foundation is required. When digging cutoff wall in the pre-excavation section, in order to avoid the fallout local soil and its consequences such as bonding chamber inside the trench excavation, bentonite slurry is used. In order to determine the elements in a slurry that can provide temporary stability is essential. In this study, due to conditions in the dam area Nohob Takestan, and assuming continuum finite difference method is used for numerical simulation and analysis of the pre-excavation. Excavation area is divided into six sections according to the digger bucket capacity and each stage is analyzed separately. After determining the critical modes using empirical relationships most hydrostatic pressure applied to the wall is determined and ultimately determined the desired slurry elements. The results of numerical modeling with the rules of procedures of the International Commission on Large Dams corresponded. And it can be concluded that continuum in the region is not far from reality excavated Nohob dam

Keywords: Cutoff Walls, Stability Analysis, Mud Cake, Numerical Modeling, Nohob Takestan Dam.
Full-Text [PDF 1725 kb]   (1059 Downloads)    
Type of Study: Research | Subject: ژئوتکنیک و مهندسی زلزله
Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Stability analysis of cut-off wall during construction and the remediation methods – Case study: Nohob Dam cut-off wall. Iranian Dam and Hydroelectric Powerplant 2018; 5 (17) :13-24
URL: http://journal.hydropower.org.ir/article-1-236-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 5, Issue 17 (9-2018) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.04 seconds with 38 queries by YEKTAWEB 4645