[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 5, Issue 16 (5-2018) ::
2018, 5(16): 64-78 Back to browse issues page
A new short term coordination approach for cascade hydro and gas power plants in security constrained unit commitment problem
Majid Moazzami , Esmaeil Ahadinia
Islamic Azad University-Najafabad Branch , m_moazzami79@yahoo.com
Abstract:   (3272 Views)

With regard to the vast amounts of gas resources in Iran and ease of constructing gas plants, these plants have been widespread in the recent years. Among the problems of gas plants include air pollutions, high operation costs, limitation of natural gas grid, and more importantly gas outages during the winters. In winter season when gas outages occur, water resources can cover the mentioned drawbacks, however in summer they might not be accessible due to sultry weather conditions. Therefore, water reservoirs should be optimally consumed over the year. To solve these problems, a novel short-term coordination security-constrained unit commitment scheduling is proposed in this paper. The scheduling by coordinating sequential hydro-power and gas power plants, and considering the constraints of natural gas transmission system supplies the required system load. The proposed model is a nonlinear model that is converted to a linear mix integer model and solved by game theory and GAMS software. The presented model is implemented on a standard IEEE 6- bus test system. Simulation results show the proposed method ability to reduce the cost and operation coordination of cascade hydro and gas units with all available constraints.
 

Keywords: Security Constrained Unit Commitment, Cascade hydro power plant, Gas power plant, Game theory.
Full-Text [PDF 1014 kb]   (527 Downloads)    
Type of Study: Research | Subject: بهره برداری و نگهداری
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Moazzami M, Ahadinia E. A new short term coordination approach for cascade hydro and gas power plants in security constrained unit commitment problem. Iranian Dam and Hydroelectric Powerplant 2018; 5 (16) :64-78
URL: http://journal.hydropower.org.ir/article-1-192-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 5, Issue 16 (5-2018) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.05 seconds with 36 queries by YEKTAWEB 4700