[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 10, Issue 36 (4-2024) ::
2024, 10(36): 14-29 Back to browse issues page
Optimum Operating of Gotvand Hydropower Plant in case of Capacity Expansion and Considering Gotvand Regulating Dam Limitations
Mohammad Reza Jalali , Saeed Jamali , Saba Kholdi
Islamic Azad University Branch of Arak , mr.jalali@iau.ac.ir
Abstract:   (380 Views)
Importance of optimal use of water resources is one of the factors of necessity of restudying of existing water projects, particularly dams and power plants. Therefore, according to the expansion of the capacity of Gotvand power plant up to 1640 megawatts, maximizing its performance is the main driver of this research. One of the objectives of optimization model developed for optimum performance of Gotvand power plant is maximizing of the value of the produced energy using a proposed combined value. Also, another objective is minimizing of the difference between maximum and minimum hourly release from the Gotvand regulation dam. Based on the results of the optimization model, the optimal power plant performance capacity was proposed according to the combination of 4 units of 250 MW and 4 units of 160 MW (1640 MW in total). In order to determine installed capacity of the Gotvand regulation power plant, a simulation was done for 64 years, in an hourly time step, by considering the downstream conditions and reservoir limitations. The results showed that optimum installed capacity is 50 to 60 megawatts.
Keywords: Gotvand dam, Optimization, Energy value, Optimum power plant operating hours, Gotvand regulating dam
Full-Text [PDF 2176 kb]   (80 Downloads)    
Type of Study: Research | Subject: هیدرولوژی و برنامه ریزی منابع آب
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Jalali M R, Jamali S, Kholdi S. Optimum Operating of Gotvand Hydropower Plant in case of Capacity Expansion and Considering Gotvand Regulating Dam Limitations. Iranian Dam and Hydroelectric Powerplant 2024; 10 (36) :14-29
URL: http://journal.hydropower.org.ir/article-1-532-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 10, Issue 36 (4-2024) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.05 seconds with 38 queries by YEKTAWEB 4660