[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 1, Issue 1 (6-2014) ::
2014, 1(1): 40-49 Back to browse issues page
Operation management of hydropower plant under Iranian power market condition (Case study: Khuzestan Region)
Abstract:   (8637 Views)
Iranian National Power Market (INPM) has been established and started since 2003 and one of the most concerning of hydropower is the INPM’s impact on the hydropower operation. According to Khuzestan Water and Power Authority (KWPA) data for Dez hydropower dam, it seems that the national dispatching center may order the operator of hydropower to increase generation of power sometimes. Results showed that in 2010 the amount of power generation based on the national dispatching center schedule for Dez hydropower weren’t matched with power generation plan of KWPA, as owner of Dez hydropower. This happened for 62% time duration of 2010. This caused to lose some water resources and the reservoir water surface level was decreased more than value obtained from rule curve operation. So in this paper, suitable guidelines has been discussed and suggested to matching the INPM and manager of KWPA power generation schedule.
Keywords: Power Market, Dez hydropower plants, Iran
Full-Text [PDF 458 kb]   (1321 Downloads)    
Type of Study: Research | Subject: بهره برداری و نگهداری
Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Operation management of hydropower plant under Iranian power market condition (Case study: Khuzestan Region). Iranian Dam and Hydroelectric Powerplant 2014; 1 (1) :40-49
URL: http://journal.hydropower.org.ir/article-1-34-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 1, Issue 1 (6-2014) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.05 seconds with 38 queries by YEKTAWEB 4660