<?xml version="1.0" encoding="utf-8"?>
<journal>
<title>Iranian Dam and Hydroelectric Powerplant</title>
<title_fa>سد و نیروگاه برق آبی ایران</title_fa>
<short_title>Journal of Dam and Hydroelectric Powerplant</short_title>
<subject>Engineering &amp; Technology</subject>
<web_url>http://journal.hydropower.org.ir</web_url>
<journal_hbi_system_id>1</journal_hbi_system_id>
<journal_hbi_system_user>admin</journal_hbi_system_user>
<journal_id_issn>2322-5882</journal_id_issn>
<journal_id_issn_online>2322-5882</journal_id_issn_online>
<journal_id_pii>8</journal_id_pii>
<journal_id_doi>7</journal_id_doi>
<journal_id_iranmedex></journal_id_iranmedex>
<journal_id_magiran></journal_id_magiran>
<journal_id_sid>14</journal_id_sid>
<journal_id_nlai>8888</journal_id_nlai>
<journal_id_science>13</journal_id_science>
<language>fa</language>
<pubdate>
	<type>jalali</type>
	<year>1396</year>
	<month>9</month>
	<day>1</day>
</pubdate>
<pubdate>
	<type>gregorian</type>
	<year>2017</year>
	<month>12</month>
	<day>1</day>
</pubdate>
<volume>4</volume>
<number>14</number>
<publish_type>online</publish_type>
<publish_edition>1</publish_edition>
<article_type>fulltext</article_type>
<articleset>
	<article>


	<language>fa</language>
	<article_id_doi></article_id_doi>
	<title_fa>ارزیابی هزینه پروژه‌های سد و نیروگاه‌های آبی از پتانسیل‌یابی تا بهره‌برداری</title_fa>
	<title>Cost Evaluation of H.P Projects From Feasibility Study to operation</title>
	<subject_fa>توسعه پایدار، زیست محیطی و ارزیابی اقتصادی</subject_fa>
	<subject>توسعه پایدار، زیست محیطی و ارزیابی اقتصادی</subject>
	<content_type_fa>پژوهشي</content_type_fa>
	<content_type>Research</content_type>
	<abstract_fa>&lt;p&gt;&lt;span dir=&quot;RTL&quot;&gt;برآورد هزینه پروژه&#8204;ها ، مدیریت و کنترل آن&amp;nbsp; یکی از ارکان اصلی مدیریت ساخت به حساب می&#8204;آید. این امر در پروژه&#8204;های بزرگ ملی (برقابی) از اهمیت دو چندانی برخوردار است. در این تحقیق به بررسی روش&#8204;های برآورد هزینه برای سدهای بزرگ برقابی پرداخته شده و برآورد هزینه در پارامتر&lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt;های&lt;/span&gt; &lt;span dir=&quot;RTL&quot;&gt;مطالعات، پیمانی، ماشین&#8204;آلات و تجهیزات،خسارت مخزن، حقوق دستمزد، و هزینه کلی سد برای برخی از سدهای برقابی مهم و خاتمه یافته کشور شامل سدهای سیمره، گتوند، کارون &lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt;۳&lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt; و کارون &lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt;۴&lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt; در دو بخش هزینه&#8204;های مصوب و&amp;nbsp; پرداختی بعنوان داده های ورودی روش گوردون استفاده شده است. &lt;/span&gt;&lt;span dir=&quot;RTL&quot;&gt;نتایج این پژوهش نشان می&#8204;دهد مدت زمان ساخت و هزینه تمام شده این پروژه&#8204;ها وابستگی شدیدی با پارامترهای محیطی و زمانی داشته همچنین مقادیر محاسبه شده برای رابط بین ارتفاع بدنه سدها و توان نیروگاه در روش گوردون جهت برآورد قیمت طرحهای برقابی مشابه محاسبه و ارائه شده&amp;nbsp; بعلاوه مشخص شده در کدام یک از پارامترهای زیر مجموعه طرحهای برقابی بیشترین مقادیر هزینه مورد نیاز است&lt;/span&gt;&lt;/p&gt;
</abstract_fa>
	<abstract>&lt;p&gt;&lt;span b=&quot;&quot; new=&quot;&quot; style=&quot;line-height: 115%; font-family:;&quot; times=&quot;&quot;&gt;&lt;font color=&quot;#000000&quot;&gt;Abstract: Project cost management and control is a major problem in some large projects cost hundreds of millions and sometimes billions of dollars from the budget exceeded the forecast is something very disturbing. A crucial factor in the successful completion of each project is to predict the correct fee (P. Smith, 2014). In this study, the methods used to estimate the cost of large hydroelectric dams were studied and then with the help of estimation method (Gordon, 1983) parameter estimates in construction and Msthdat, Accord, machinery and equipment, land, project staff remuneration, other assets not producing and the overall cost of the dam to dam Seimareh, Scroll, Karun 3 and Karun 4 with growth rates of 8%, 10%, 13%, 15%, 17% and 20% in the cost of approved and fees were assessed and finally to estimate appropriate and predictable cost projects, hydropower in two approved and paid the coefficient k (a factor which is based on engineering judgment for each project) in three parts, maximum, minimum and average is calculated&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;
</abstract>
	<keyword_fa>ارزیابی هزینه, نیروگاه‌های آبی, روش گوردون, برآورد اقتصادی</keyword_fa>
	<keyword>Price, H.P projects,Gordon Method,estimation method</keyword>
	<start_page>15</start_page>
	<end_page>23</end_page>
	<web_url>http://journal.hydropower.org.ir/browse.php?a_code=A-10-316-1&amp;slc_lang=fa&amp;sid=1</web_url>


<author_list>
	<author>
	<first_name>SAEED</first_name>
	<middle_name></middle_name>
	<last_name>JAMALI</last_name>
	<suffix></suffix>
	<first_name_fa>سعید</first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa>جمالی</last_name_fa>
	<suffix_fa></suffix_fa>
	<email>saeed.jamali@gmail.com</email>
	<code>0067213405</code>
	<orcid>10031947532846001856</orcid>
	<coreauthor>Yes
</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


	<author>
	<first_name>SEYED ALI</first_name>
	<middle_name></middle_name>
	<last_name>SHAHROKHI</last_name>
	<suffix></suffix>
	<first_name_fa>سید علی</first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa>شاهرخی</last_name_fa>
	<suffix_fa></suffix_fa>
	<email>a.shahrokhi@iwpco.ir</email>
	<code>0069131120</code>
	<orcid>10031947532846001857</orcid>
	<coreauthor>No</coreauthor>
	<affiliation>IRAN WATER&amp;POWER DEVELOPMENT CO (IWPCO)</affiliation>
	<affiliation_fa>شرکت آب و نیرو</affiliation_fa>
	 </author>


</author_list>


	</article>
</articleset>
</journal>