[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
Indexing::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last site contents
:: New Journal website launched
..
Last contents of other sections
..
:: Volume 5, Issue 16 (5-2018) ::
2018, 5(16): 1-12 Back to browse issues page
Exploring the potential of electrical energy recovery from Ilam water supply pipelines
Mohammad Mohammadi , Mehdi Yasi , Saeed Jamali , Hooman Hajikandi
, m_yasi@yahoo.com
Abstract:   (2996 Views)

Power generation from water networks is a new practice in the optimization of water systems management. In water supply networks, pressure relief valves are often used to avoid additional pressures on the downstream. With the presence of extra energy head in Water supply pipelines, hydropower generation is possible using either turbine or pump as turbine (PAT). In this study, the potential of energy recovery from the existing water supply system in the City of Ilam, Iran, was investigated using turbine and PAT hydropower plants. This survey indicated the feasibility of hydropower generation in almost ten stations along the Ilam’s water supply system, with the capacities in orders of mini to Pico hydropower plants. The total amount of generated energy per year is about 1641780 kWh using turbines, and 1231335 kWh in the case of using PATs. The results from economic analysis indicate that the cost of unit energy is about 1065 Rials using turbines, and 365 Rials with the use of PATs. The benefit-cost ratio is 1.7 and 5.9 for using turbines and PATs, respectively. In general, the use of PATs in small hydropower systems on the Ilam’s water supply system is technically feasible, and economically affordable alternative.

Keywords: Electricity generation, Hydropower plant, Water supply pipelines, Turbine, PAT, Cost analysis
Full-Text [PDF 721 kb]   (384 Downloads)    
Type of Study: Research | Subject: تجهیزات مکانیکی و هیدرومکانیک
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Mohammadi M, Yasi M, Jamali S, Hajikandi H. Exploring the potential of electrical energy recovery from Ilam water supply pipelines. Iranian Dam and Hydroelectric Powerplant 2018; 5 (16) :1-12
URL: http://journal.hydropower.org.ir/article-1-255-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 5, Issue 16 (5-2018) Back to browse issues page
نشریه سد و نیروگاه برق آبی Journal of Dam and Hydroelectric Powerplant
Persian site map - English site map - Created in 0.08 seconds with 38 queries by YEKTAWEB 4645